Building in a cold climate

In a heating-dominated climate the envelope is almost the whole story. Insulation, air tightness and the avoidance of cold spots decide both the bills and whether the building stays dry.

Where cold climates punish

The temperature difference across the wall is large for most of the year, so conduction and air leakage both cost more than they would further south. Thermal bridges become cold spots, and cold spots inside a warm humid building become condensation.

Construction season is short, which puts a premium on closing a building in quickly.

Sequential site framing against parallel panel manufacture Stick framing runs after the foundation. Panels are manufactured while the foundation is completed and shipped when the site is ready, so the shell goes up in days. Built on site, in sequence Foundation Frame, sheath, insulate Interior trades longer Panelised, in parallel Foundation Panels manufactured Erect Interior trades shorter
Guardian states the rough construction of the exterior envelope drops by over 50 percent, the overall build by 20 to 35 percent, and that a typical 2,000 sq ft home can be under roof in 2 to 3 days.

What works

Continuous insulation with no bridge, an air barrier that is actually tested, ventilation with heat recovery so the fresh air does not throw the heat away, and a wall that can dry inward or outward when it needs to.

Panelised shells suit short seasons: the components are made under cover while the site work proceeds, and the shell goes up in days rather than weeks.

What Guardian publishes

  • Guardian's climate guidance states that Shield™ panel cost savings optimise gains and losses based on climate.

    Source · Products page, climate section

  • Muldoon Garden in Anchorage, Alaska was built with the Shield™ system.

    Source · Muldoon Garden case study

  • On the aloft Airport Hotel in Buffalo, New York, Shield™ curtain walls of 6 inch solid EPS and cold-formed steel closed the building in quickly so sub-trades could work sheltered through a Buffalo winter, and the project opened on schedule despite the weather.

    Source · aloft Airport Hotel case study

Written by Data Subsystems, for Guardian Structural Technologies. Last updated .

Drafted from Guardian Structural product literature and published building-science sources. Awaiting Guardian technical review. Confirm any figure against the current product documents or ask us before you rely on it in a design.

Talk to us about your project

Tell us what you are building. We design and produce the envelope to your exact drawings, residential or commercial.

Contact us