How it is made, and how it goes up

The whole sequence, from the factory floor to the building official's sign-off, drawn from Guardian's specification and production material.

  1. 1

    How a Shield™ panel is made

    Galvanized steel studs are set flush into an expanded polystyrene core on both faces and fastened in the factory under quality control, then each panel is cut and shaped to the shop drawings.

  2. 2

    From drawings to delivery

    A purchase agreement and a project information sheet start the process; shop drawings follow; panels are manufactured while the foundation is completed and shipped when the site is ready.

  3. 3

    What the site must have ready

    Foundations and sub-structures must be dimensionally accurate, square, level and plumb, inspected and confirmed as such, with concrete complete and properly cured.

  4. 4

    Installing the panels

    Panels are placed by hand or with a Lull or Gradall by a rough carpentry or light-gauge steel crew, connected with galvanized angle or track and TEK screws, and can be modified in the field.

  5. 5

    Delivery, storage and handling

    Unload without compromising structural or thermal integrity, store clean, dry and at least six inches off the ground, protect from weather, and cover roof panels after installation.

  6. 6

    Quality assurance and inspection

    Guardian is the exclusive fabricator and certifies the third-party components; the installed system is subject to the review, inspection and approval of the authorizing building officials.

The whole sequence in one minute

Our animation of a two-story house going together. For the wall installation step by step, see installing the panels.

Shield™ Panel Installation Animation 1:03 Watch on YouTube

What the animation shows

Talk to us about your project

Tell us what you are building. We design and produce the envelope to your exact drawings, residential or commercial.

Contact us