Skip to content
Guardian Structural Technologies

From drawings to delivery

A purchase agreement and a project information sheet start the process; shop drawings follow; panels are manufactured while the foundation is completed and shipped when the site is ready.

Guardian's specification sets out the submittals: a purchase agreement defining the scope of work, and Guardian's own Project Information Sheet. Shop drawings are then produced from them.

Because the panels are engineered and supplied to the construction plans, the design decisions move earlier than they would in stick framing. Openings, services and connections are resolved on the drawings rather than on site.

Manufacture then runs in parallel with the foundation. Panels can be made while the foundation is completed and shipped to site when it is ready, which is where a large part of the schedule saving comes from.

What Guardian publishes

  • Submittals are a purchase agreement outlining the scope of work and Guardian's Project Information Sheet; shop drawings are then provided.

    Source · 3-Part Specification 1.4

  • Panels can be manufactured while the foundation is completed and shipped to site when ready.

    Source · Differentiation sheet

  • Panels are engineered and supplied per the construction plans, with rough openings for windows and doors and all components needed for installation including interior wall attachments.

    Source · Differentiation sheet

Written by Data Subsystems, for Guardian Structural Technologies. Last updated .

Drafted from Guardian Structural product literature and published building-science sources. Awaiting Guardian technical review. Confirm any figure against the current product documents or ask us before you rely on it in a design.

Talk to us about your project

Tell us what you are building. We design and produce the envelope to your exact drawings, residential or commercial.

Contact us