Hotels and hospitality
Hotels combine repetition, a hard opening date and guests who notice noise and drafts. All three favour a factory-made envelope.
A hotel has a date. Revenue starts when the doors open, and every week of shell construction is a week of that revenue not happening. Closing the building in quickly is worth more than it looks on a bar chart.
Guests judge a hotel partly on quiet. Demising walls between rooms and corridor walls are acoustic elements as much as fire ones, and an engineered Shield™ assembly reaches STC 59.
Both hotel projects in Guardian's portfolio turned on schedule. In Buffalo the curtain wall let the trades work through winter; in Atlanta the system absorbed a mid-project change of architect and contractor and was still delivered in two phases.
What Guardian publishes
-
aloft Airport Hotel, Buffalo: 90,000 sq ft, 153 rooms over 6 floors; Shield™ curtain walls of 6 inch solid EPS and cold-formed steel closed the building in quickly and it opened on schedule despite a Buffalo winter.
Source · aloft Airport Hotel case study
-
Cambria Suites Hotel, Atlanta: 4 storeys, over 91,000 sq ft; the complete exterior curtain wall system was fabricated and shipped in two phases and the client also selected the system for a large portion of the roof.
Source · Cambria Suites Hotel case study
-
Multi-use construction, hospitals and hotels are named commercial markets.
Source · Market page
Written by Data Subsystems, for Guardian Structural Technologies. Last updated .
Drafted from Guardian Structural product literature and published building-science sources. Awaiting Guardian technical review. Confirm any figure against the current product documents or ask us before you rely on it in a design.